Western Harbour Tunnel

A 6.5-kilometre motorway tunnel under Sydney Harbour, with three lanes each way, between the Rozelle Interchange and the Warringah Freeway near North Sydney.

The Western Harbour Tunnel is a new road crossing of Sydney Harbour. It is the first new road crossing of the harbour in more than 30 years. The twin tunnels are 6.5 kilometres long, with three lanes in each direction, and connect the WestConnex M4 and M8 at the Rozelle Interchange to the Warringah Freeway near North Sydney. The route passes under the harbour between Birchgrove and Waverton and bypasses the Sydney CBD.

Transport for NSW expects the tunnel to reduce traffic by 35 per cent on the Western Distributor, 20 per cent in the Sydney Harbour Tunnel, and 17 per cent on the Sydney Harbour Bridge. The tunnel will stay in public ownership.

Stage 1

A joint venture of John Holland and CPB Contractors excavated the 1.7-kilometre southern section, from under Emily Street in Rozelle to Cove Street in Birchgrove. The work started in mid-2022 and finished in February 2025, when the joint venture handed the tunnels to the Stage 2 contractor.

Stage 2

Transport for NSW awarded Stage 2 to ACCIONA in December 2022, with a contract value of $4.24 billion. Stage 2 covers 4.8 kilometres of tunnels from Birchgrove to Cammeray, the connections to the Warringah Freeway, and the fit-out of the whole tunnel.

The northern section, between Cammeray and Waverton, was excavated with roadheaders working from the Warringah Freeway. Under the harbour, two slurry tunnel boring machines excavate the last 1.5 kilometres. TBM Patyegarang started in July 2026 and TBM Barangaroo in August 2026, both from caverns 44.7 metres below Birchgrove Oval. Each machine is 15.7 metres in diameter and weighs about 4,350 tonnes. The tunnel lining uses about 13,000 precast concrete segments made at Emu Plains.

Mechanical and electrical fit-out, including ventilation, fire safety, lighting, signs and traffic control systems, continues after tunnelling.

Companies on this project

Plan the equipment and transport for each project

Idalia links assets, allocations, and transport loads to each project, so the office and the site work from the same plan.

Explore projects

Idalia checked this page against its sources on 8 November 2026. Report a correction

Correct this page

Worked on this project, or see an error? Tell us what to change. We check each request against public sources.

We use your details only to answer this request.