M12 Motorway
A 16-kilometre toll-free motorway between the M7 at Cecil Hills and The Northern Road at Luddenham, and the main road access to Western Sydney International Airport.
The M12 Motorway is an east-west motorway in Western Sydney, about 16 kilometres long, between the M7 Motorway at Cecil Hills and The Northern Road at Luddenham. It gives direct road access to Western Sydney International (Nancy-Bird Walton) Airport at Badgerys Creek. The motorway is toll free, with a 100 km/h speed limit and no intersections between Elizabeth Drive and The Northern Road. Transport for NSW expects it to take about 25,000 vehicles a day off local roads.
Sections and contractors
Transport for NSW split the work into three parts.
- West section. About 6 kilometres from The Northern Road to east of Badgerys Creek, with 11 bridges and the interchange for the airport access road. A joint venture of CPB Contractors and Georgiou Group built it.
- Central section. About 7.5 kilometres from east of Badgerys Creek to Duff Road at Cecil Park, through the Western Sydney Parklands, with seven bridges including bridges over South Creek and Kemps Creek. Seymour Whyte built it.
- M7–M12 Integration project. The interchange with the M7, the connection to Elizabeth Drive, and a widening of the M7. John Holland designed and built it for the M7 concession company.
Timeline
Major construction started in August 2022. After about four years of work, the motorway between Elizabeth Drive and The Northern Road opened on 14 March 2026, before the airport started flights. The M7–M12 Interchange opened in mid-2026, which completed the motorway-to-motorway connection.
The project built 17 bridges and a shared path along the motorway. Transport for NSW reports more than 5.2 million hours worked and 10,000 people employed, including 4,900 local workers.
Companies on this project
- Transport for NSWClient
- CPB ContractorsJoint venture partner
West section, 6 km with 11 bridges and the airport interchange, with Georgiou Group
- Georgiou GroupJoint venture partner
West section, 6 km with 11 bridges and the airport interchange, with CPB Contractors
- Seymour WhytePrincipal contractor
Central section, 7.5 km with seven bridges
- John HollandPrincipal contractor
M7–M12 Integration project: the M7 interchange, the Elizabeth Drive connection and the M7 widening
Related projects
- Western Harbour TunnelUnder construction · Rozelle to North Sydney, NSW
A 6.5-kilometre motorway tunnel under Sydney Harbour, with three lanes each way, between the Rozelle Interchange and the Warringah Freeway near North Sydney.
- Sydney Metro WestUnder construction · Westmead to Sydney CBD, NSW
A 24-kilometre underground metro railway between Westmead and Hunter Street in the Sydney CBD, with nine stations and a target opening in 2032.
- Warringah Freeway UpgradeUnder construction · North Sydney, NSW
An upgrade of four kilometres of the Warringah Freeway between North Sydney and Naremburn, built in live traffic and due for completion in late 2026.
- Botany Rail DuplicationCompleted · Mascot to Port Botany, NSW
A second track on the last 2.9-kilometre single-track section of the freight rail line between Mascot and Port Botany, with four new rail bridges.
- Sydney Metro – Western Sydney AirportUnder construction · St Marys to Bradfield, NSW
A 23-kilometre metro railway from St Marys to Bradfield City Centre through Western Sydney International Airport, with six stations.
- Coffs Harbour BypassUnder construction · Coffs Harbour, NSW
A 14-kilometre bypass of Coffs Harbour on the Pacific Highway, from Englands Road in the south to Sapphire in the north, with three road tunnels.
Plan the equipment and transport for each project
Idalia links assets, allocations, and transport loads to each project, so the office and the site work from the same plan.
Idalia checked this page against its sources on 8 November 2026. Report a correction
Correct this page
Worked on this project, or see an error? Tell us what to change. We check each request against public sources.