> ## Documentation Index
> Fetch the complete documentation index at: https://useidalia.com/docs/llms.txt
> Use this file to discover all available pages before exploring further.

# How to get work done with Idalia AI

> Ask Idalia AI to create and update records while you stay in the work. The same records show up on the page.

## Overview

A lot of work in Idalia is creating and updating records: a project, a transport order, a form. You can do all of that on the page. You can also stay where you are and ask the AI agent to do it.

In this guide, the prompts follow one project from the empty workspace to assets on site. You add the customer, put the assets on the books, win the project, break it into work, book the assets, and plan the trucks. The records that come out are the same ones you would create on the page. Anyone else can open them, change them, or find them later.

The agent can only do what you have permissions to do. If you cannot create a project on the page, the agent cannot create one for you, either.

## Open the chat

You can open the AI chat from anywhere in Idalia. Press the message icon in the top right corner, or use the <kbd>Alt</kbd> + <kbd>I</kbd> shortcut.

The agent can see which page you're on and the information on it, so you can say "set this to In Progress" without repeating the name and it's smart enough to figure it out.

To point at a record that is not the page you are on, type `@` and choose it. You can also attach files.

**New chat** starts a fresh thread. **History** opens earlier ones. The expand control opens the chat on its own page for focused work.

## Run a project from scratch

Keep one chat and send the prompts in order. Together they run a hire yard in Wetherill Park that wins a tower crane project for ACME Civil at International Towers Sydney.

The agent uses the page you are on, so you can say "this" instead of the name.

### 1. Add the customer

```text wrap theme={null}
Add ACME Civil as a customer.
```

### 2. Put the assets on the books

The chat shows **Approve** before it writes assets or asset types. Press **Approve** to save.

```text wrap theme={null}
Add a 1000 STD tower asset type to the catalog with SKU TWR-1000.
```

```text wrap theme={null}
Add serial numbers SN-101 to SN-104 as 1000 STD towers. They are all Ready, at the Wetherill Park yard.
```

### 3. Create the project

```text wrap theme={null}
We won Barangaroo tower crane for ACME Civil at International Towers Sydney.

Create the project. Start next Monday, end after 3 months. Set status to Planned.
```

### 4. Break the project into work

```text wrap theme={null}
On Barangaroo tower crane, create work orders Mobilise, Erect, and Commission.

Mobilise starts next Monday. Assign it to me.
```

### 5. Book the assets on the project

On an allocation order, "load" means add assets to the order, not a truck trip.

```text wrap theme={null}
Create an allocation for Barangaroo tower crane from next Monday to 20 December 2026.

Add the four 1000 STD towers SN-101 to SN-104.
```

### 6. Plan the delivery

```text wrap theme={null}
Create a transport order to deliver SN-101 to SN-104 from the Wetherill Park yard to International Towers Sydney on Thursday at 06:00. Tag it Urgent. Attach it to the project.
```

Open the chat on that transport order and say:

```text wrap theme={null}
Add a second load for the counterweights and pins. Arrive by 07:30. Keep the towers on Load 1.
```

When the project end date is set, plan the trip home:

```text wrap theme={null}
Copy that order as a return trip with the loads in reverse order. Pickup is 20 December.
```

### 7. Start the project

Open the chat on the project page and say:

```text wrap theme={null}
Set this to In Progress. Move the end date to 20 December 2026.
```

### 8. Add the site checks

Create the forms once. Later projects reuse them.

```text wrap theme={null}
Create a published form named Tower section prestart. Connect it to Asset.

Add:
- Checklist: Pins, bolts, and connections are in place
- Images: Anything that is damaged or missing
- Signature: The rigger accepts the section
```

```text wrap theme={null}
Create two forms: Transport dispatch and Transport receipt.
Publish both. Connect each one to TransportLeg.

Transport dispatch, filled at the yard before the truck leaves:
- Checklist: These are the right assets for this load, and they are safely loaded
- Images: The assets on the truck
- Signature: The driver accepts the load

Transport receipt, filled at the site when the truck arrives:
- Choice: On time, or Delayed
- Choice: No damage, or Damage
- Signature: The site accepts the load
```

### 9. Ask about the project

These prompts use the records you just created.

```text wrap theme={null}
Is ACME Civil a customer?
```

```text wrap theme={null}
Which projects are in progress?
```

```text wrap theme={null}
What work is on Barangaroo tower crane?
```

```text wrap theme={null}
Where are the 1000 STD towers SN-101 to SN-104?
```

```text wrap theme={null}
What assets are allocated to Barangaroo tower crane?
```

```text wrap theme={null}
What goes to International Towers Sydney on Thursday?
```

```text wrap theme={null}
Show the Tower section prestart form.
```

### 10. Do the same project in one message

After you know the steps, you can send the setup as one prompt. Use a new chat, or skip this if you already sent steps 1 to 6.

```text wrap theme={null}
We won Barangaroo tower crane for ACME Civil at International Towers Sydney.

Create the project, start next Monday, end after 3 months, status Planned.

Add work orders Mobilise, Erect, and Commission.

Create an allocation from next Monday to 20 December 2026 with 1000 STD towers SN-101 to SN-104.

Create a transport order from the Wetherill Park yard to site next Thursday at 06:00 for those towers. Add a second load for the counterweights and pins at 07:30.
```

### 11. Remove the walkthrough

When you no longer need the example project:

```text wrap theme={null}
Delete the project Barangaroo tower crane.
```

If the chat shows **Approve**, the project is not deleted yet. The confirmation lists work orders, allocation orders, and transport orders that go with it. Press **Approve** to delete. The customer, the asset types, and the four towers stay on the books.

## Let it run without you in the chat

Use chat when you are in the work and you want the change now. Use an [automation](https://useidalia.com/docs/workflows/automations.md) when the same work should run from a form, an email, or a schedule.

After the Transport dispatch form from step 8 exists, ask the agent to watch every submission:

```text wrap theme={null}
Create an automation that runs when the Transport Dispatch form is submitted.

It should review all of the images and ensure the assets are correctly loaded and secured for transport.

If anything looks off or potentially unsafe, notify me immediately.
```

Each run has a **reviewer**. That person checks work that happened while nobody was in the chat.

## Check the result

Open `Barangaroo tower crane`. The customer is ACME Civil, the site is International Towers Sydney, the dates are 23 November 2026 to 20 December 2026, and the status is **In Progress**. That is the same project you would have created by hand.

The overview also shows work orders Mobilise, Erect, and Commission, an allocation with SN-101 to SN-104, the Thursday delivery with two loads, and the 20 December return.

The next project uses the same chat. Change the names and send again. The four towers and ACME Civil are already there, so start at the project.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.