# How to manage the useful life of assets

> Set how long plant should last, record the hours it has run, and see what is left before you replace it.

## Overview

In this guide, we'll see how Idalia can help you manage the useful life of your fleet.

As an example, we'll use a small 20t excavator fleet sitting in a yard in Wetherill Park. Let's say their useful life is 10,000 hours each.

| Asset | Operating hours | Notes |
| - | - | - |
| EX-01 | 1,840 | Newer machine. Uses the catalog life. |
| EX-07 | 9,420 | Same type. Close to the end. |
| EX-12 | 4,100 | Rebuilt last year. Its life is longer than the catalog. |

While we'll only use three excavators for this example, Idalia can handle a much larger fleet, and any mix of types.

## Before you start

Go to [Asset types](https://idalia.app/asset-types) and add the fleet above. Open Idalia AI and paste the following message:

```text wrap theme={null}
Add a 20t excavator type to the catalog, with assets EX-01, EX-07, and EX-12 at Wetherill Park, NSW.

Create an allocation named Wetherill Park hire. Add EX-01, EX-07, and EX-12.
```

Or, you can add the fleet manually in the app.

## Set the useful life

Open the **20t excavator** asset type. Useful life belongs on here first. Asset types set the default useful life for all assets of that type. You can [override](#override-life-on-one-machine) this on each asset.

Set the useful life for the 20t excavator type to 10,000 hours now.

To use Idalia AI, copy and paste the following message:

```text wrap theme={null}
On the 20t excavator asset type, set useful life to 10,000 hours.
```

Or in the app, choose the **Useful life** property, enter `10000` hours, and save.

One year is 365 days. One day is 24 hours. You can enter life in years, days, or hours. **Lifecycle** always shows the result in hours.

Now go to the **Assets** tab and open EX-12. Notice how the useful life of the asset is now 10,000 hours, even though we only updated the type. It's inheriting its useful life from its type.

## Override the default useful life

Now let's assume that EX-12 was refurbished extensively, so its useful life is actually longer than the others of this type.

Set its useful life to 12,000 hours now. Use Idalia AI:

```text wrap theme={null}
On EX-12, set useful life to 12,000 hours.
```

Or in the app, choose the **Useful life** property, enter `12000` hours, and save.

Note the useful life of EX-12 is now 12,000 hours, but the 20t excavator type is still at the original 10,000 hours and so are the other assets of that type. That's because we only changed EX-12.

## Record operating hours

Idalia can help you keep track of which assets are coming up to the end of their useful life and need to be replaced. We do this by recording operating hours.

Operating hours are the accumulated time that an asset has been in use. They show how much of an asset's life is already used and how much is left.

There's a few different ways to add them, which one you use depends on your workflow.

### Add hours on the asset

Staying on EX-12, let's say the meter reads 4,100 at the end of the week. Update it directly on the asset using Idalia AI:

```text wrap theme={null}
On EX-12, set the hour meter to 4,100 hours.
```

Or in the app, open **Lifecycle** and press **Add usage**.

* **Add hours** when you know how long the machine ran, and when that run ended. The end time must be in the past.
* **Set total** when you are reading the hour meter. Enter `4100`. Idalia adds the difference from the hours already on the asset. The reading cannot be lower than the total at that time.

Either path shows `4,100 of 12,000 h` in the **Lifecycle** section.

To add the same hours to several assets at once, open [Assets](https://idalia.app/assets), select EX-12 and any others, and press **Add usage** on the selection bar. Idalia adds those hours once to each selected asset.

### Add hours from an allocation

You can also add hours to all the assets that are on hire at a site.

Go to allocations, then open **Wetherill Park hire** from the list.

Then paste the below into Idalia AI, or choose **Add usage** on an asset or group of assets.

```text wrap theme={null}
On Wetherill Park hire, add 1,000 hours of usage to each assigned asset.
```

Go to any of those assets and note that the hours have been added.

### Capture hours from a form

You can also build a workflow in Idalia to streamline things.

For example, create a form for users to submit in the yard or on site that records the hours a machine ran. Then run an automation when the form submits that adds that adds those usage hours to the assets after the form is submitted.

Paste the below into Idalia AI to set it up:

```text wrap theme={null}
Create a published form named Hour meter reading.
Description: Record the hours a machine ran, at the end of a shift or job.

Add a short, clear title and description to each field.

- Assets: The machines you are recording. Select one or more assets.
- Number: Hours run. How many hours those machines ran. Use the same hours for every asset in this response.

Create an automation that runs when Hour meter reading is submitted.
Add those hours as usage on each asset in the response. Turn the automation on.
```

Or, do it manually in the app:

1. Go to [Forms](https://useidalia.com/docs/workflows/forms.md) and create a form named **Hour meter reading**.
2. Add a **Number** field named **Hours run**, with some descriptions to help employees fill it in.
3. Create an automation in [Automations](https://useidalia.com/docs/workflows/automations.md) and trigger it to run when the **Hour meter reading** form is submitted. Instruct it to add the hours as usage on those assets.
4. Ensure the automation is **Active**, then publish and share the form.

Submit **Hour meter reading** for EX-12 with a few hours. Wait for up to a minute, then open EX-12 and check **Lifecycle**. The hours should be on the asset.

### Hardware engine hours

If hardware on the machine sends engine hours, Idalia can add that usage to every assigned asset on the [allocation](https://useidalia.com/docs/allocations/introduction.md). This is a custom setup and requires a bespoke solution for your hardware.

## Manage remaining life

### For a single asset

Open EX-07. **Lifecycle** shows the share of life already used, hours left (or hours past life), a bar, and the total — here `9,420 of 10,000 h`. That is 580 hours left.

Press **View history** to see usage over time. Press it again to return to the bar.

### For multiple assets

To scan multiple assets, open [Assets](https://idalia.app/assets) and turn on **Lifecycle** in the display options. Each row shows a lifecyle bar that represents the asset's remaining life. Hover over the bar to see more details.

EX-01 looks early in its life. EX-07 looks almost full. EX-12 uses 12,000 hours, so 4,100 hours used still reads as mid-life.

### For an asset type

Idalia also shows you a high-level view of the useful life of all assets of a type.

Open the **20t excavator** asset type and open the **Lifecycle** section in the side panel. The chart groups those assets by their share of useful life expended: 0%, under 25%, 25–50%, 50–75%, 75–100%, and past life. Assets with no useful life are left out of the chart.

EX-07 is in the 75–100% band. Plan a replacement or a rebuild here, not when the machine fails on site.

### Set a weekly check

You can use Idalia AI to automatically check for assets past 75% of useful life and alert you.

Paste the below into Idalia AI:

```text wrap theme={null}
Create an automation that runs every week.
Find which 20t excavators are past 75% of useful life, and how many hours are left on each.
Email me the result. Turn the automation on.
```

Or, do it manually in the app:

1. Go to [Automations](https://useidalia.com/docs/workflows/automations.md) triggered on a schedule: **Every week**.
2. Instruct it to list 20t excavators past 75% of useful life and remaining hours, and send you an email with the result.
3. Set the automation to **Active**.