# Useful life

> Track operating hours against the useful life of each asset.

The **Lifecycle** section on an asset tracks how many hours the machine has run against its useful life. Use it to see what is left, and which machines are past their life.

For a worked example with a 20t excavator fleet, see [Manage useful life](https://useidalia.com/docs/guides/manage-asset-useful-life.md).

Asset status is a separate field. It shows the stage of the asset, such as ready or on hire. See [Asset statuses](https://useidalia.com/docs/assets/manage.md#asset-statuses).

## Useful life and operating hours

**Useful life** is how long the machine is expected to run, stored as hours. You can enter it in years, days, or hours. One year is 365 days. One day is 24 hours. The Lifecycle section always shows the result in hours.

**Operating hours** are the hours the machine has already run. Idalia adds each usage record to the total.

**Remaining** is useful life minus operating hours. When operating hours pass useful life, the remainder is shown as hours past life.

## Set a default useful life

Set useful life on the [asset type](https://useidalia.com/docs/assets/types.md), and each asset of that type uses this default useful life.

1. Open the asset type.
2. On the overview, choose **Useful life**.
3. Enter an amount and a unit: years, days, or hours.
4. Save. Clear the field to remove the catalog life.

## Override the default useful life

You can override the default asset type useful life for a single asset if needed. Open the asset and, in **Lifecycle**, set a new useful life for that asset. Choose **Use catalog life** to go back to the default from the asset type.

If no life is set, **Lifecycle** shows **Set useful life**.

## Add operating hours

On the asset overview, open **Lifecycle** and press <kbd>Add usage</kbd>.

The dialog has two modes:

* **Add hours** adds a number of hours that ended at a time you set. The end time must be in the past.
* **Set total** sets the hour-meter reading. Idalia adds the difference between that reading and the current total. The reading cannot be lower than the total at that time.

On the [Assets](https://idalia.app/assets) list, select assets and choose **Add usage**. Idalia adds the same hours once to each selected asset.

## Add hours on an allocation

On an [allocation](https://useidalia.com/docs/allocations/introduction.md), choose **Add usage** on one item or a selection. Idalia adds those hours once to each assigned asset. Items with no assigned asset are skipped.

## Read the lifecycle

On the asset overview, **Lifecycle** shows:

* The share of useful life already used, as a percent
* Hours left, or hours past life
* A bar of hours used against useful life
* Operating hours of useful life, for example `1,840 of 10,000 h`

Press <kbd>View history</kbd> to see usage over time. Press it again to return to the bar.

On the [Assets](https://idalia.app/assets) list, open display options and turn on **Lifecycle**. Each row shows a short bar. Hover the bar to see expired hours, useful life, and remaining hours. A dash means no useful life is set.

On an asset type, open the **Lifecycle** section in the side panel. The chart groups the assets of that type by share of useful life: 0%, under 25%, 25–50%, 50–75%, 75–100%, and past life. Assets with no useful life are left out of the chart.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.