{"type":"project","id":"dprj_western_harbour_tunnel","slug":"western-harbour-tunnel","url":"https://useidalia.com/construction-projects/western-harbour-tunnel","name":"Western Harbour Tunnel","summary":"A 6.5-kilometre motorway tunnel under Sydney Harbour, with three lanes each way, between the Rozelle Interchange and the Warringah Freeway near North Sydney.","description":"The Western Harbour Tunnel is a new road crossing of Sydney Harbour. It is the first new road crossing of the harbour in more than 30 years. The twin tunnels are 6.5 kilometres long, with three lanes in each direction, and connect the WestConnex M4 and M8 at the Rozelle Interchange to the Warringah Freeway near North Sydney. The route passes under the harbour between Birchgrove and Waverton and bypasses the Sydney CBD.\n\nTransport for NSW expects the tunnel to reduce traffic by 35 per cent on the Western Distributor, 20 per cent in the Sydney Harbour Tunnel, and 17 per cent on the Sydney Harbour Bridge. The tunnel will stay in public ownership.\n\n## Stage 1\n\nA joint venture of John Holland and CPB Contractors excavated the 1.7-kilometre southern section, from under Emily Street in Rozelle to Cove Street in Birchgrove. The work started in mid-2022 and finished in February 2025, when the joint venture handed the tunnels to the Stage 2 contractor.\n\n## Stage 2\n\nTransport for NSW awarded Stage 2 to ACCIONA in December 2022, with a contract value of $4.24 billion. Stage 2 covers 4.8 kilometres of tunnels from Birchgrove to Cammeray, the connections to the Warringah Freeway, and the fit-out of the whole tunnel.\n\nThe northern section, between Cammeray and Waverton, was excavated with roadheaders working from the Warringah Freeway. Under the harbour, two slurry tunnel boring machines excavate the last 1.5 kilometres. TBM Patyegarang started in July 2026 and TBM Barangaroo in August 2026, both from caverns 44.7 metres below Birchgrove Oval. Each machine is 15.7 metres in diameter and weighs about 4,350 tonnes. The tunnel lining uses about 13,000 precast concrete segments made at Emu Plains.\n\nMechanical and electrical fit-out, including ventilation, fire safety, lighting, signs and traffic control systems, continues after tunnelling.","projectStatus":"under_construction","projectType":"tunnel","region":"Sydney","locality":"Rozelle to North Sydney, NSW","keyDates":[{"label":"Stage 1 tunnelling started","value":"Mid-2022"},{"label":"Stage 2 contract awarded","value":"December 2022"},{"label":"Stage 1 completed","value":"February 2025"},{"label":"Harbour TBMs started","value":"July and August 2026"},{"label":"Opening to traffic","value":"2028"}],"estimatedValueAud":null,"estimatedValueBasis":null,"officialUrl":"https://caportal.com.au/rms/wht/about","participants":[{"name":"Transport for NSW","role":"client","scope":null,"url":"https://useidalia.com/companies/transport-for-nsw.json"},{"name":"ACCIONA","role":"principal_contractor","scope":"Stage 2: 4.8 km of tunnels including the harbour crossing, and the complete tunnel fit-out","url":"https://useidalia.com/companies/acciona.json"},{"name":"John Holland","role":"jv_partner","scope":"Stage 1: 1.7 km of southern tunnels from Rozelle to Birchgrove, with CPB Contractors","url":"https://useidalia.com/companies/john-holland.json"},{"name":"CPB Contractors","role":"jv_partner","scope":"Stage 1: 1.7 km of southern tunnels from Rozelle to Birchgrove, with John Holland","url":"https://useidalia.com/companies/cpb-contractors.json"}],"categories":[],"related":[{"name":"Sydney Metro West","summary":"A 24-kilometre underground metro railway between Westmead and Hunter Street in the Sydney CBD, with nine stations and a target opening in 2032.","url":"https://useidalia.com/construction-projects/sydney-metro-west.json"},{"name":"M12 Motorway","summary":"A 16-kilometre toll-free motorway between the M7 at Cecil Hills and The Northern Road at Luddenham, and the main road access to Western Sydney International Airport.","url":"https://useidalia.com/construction-projects/m12-motorway.json"},{"name":"Warringah Freeway Upgrade","summary":"An upgrade of four kilometres of the Warringah Freeway between North Sydney and Naremburn, built in live traffic and due for completion in late 2026.","url":"https://useidalia.com/construction-projects/warringah-freeway-upgrade.json"},{"name":"Botany Rail Duplication","summary":"A second track on the last 2.9-kilometre single-track section of the freight rail line between Mascot and Port Botany, with four new rail bridges.","url":"https://useidalia.com/construction-projects/botany-rail-duplication.json"},{"name":"Sydney Metro – Western Sydney Airport","summary":"A 23-kilometre metro railway from St Marys to Bradfield City Centre through Western Sydney International Airport, with six stations.","url":"https://useidalia.com/construction-projects/sydney-metro-western-sydney-airport.json"},{"name":"Coffs Harbour Bypass","summary":"A 14-kilometre bypass of Coffs Harbour on the Pacific Highway, from Englands Road in the south to Sapphire in the north, with three road tunnels.","url":"https://useidalia.com/construction-projects/coffs-harbour-bypass.json"}],"sources":[{"url":"https://caportal.com.au/rms/wht/about","title":"About the project","publisher":"Transport for NSW","publishedOn":null,"accessedOn":"2026-11-08","note":null},{"url":"https://caportal.com.au/rms/wht/faqs?view=NavLink_11eb06f4","title":"Western Harbour Tunnel FAQs","publisher":"Transport for NSW","publishedOn":null,"accessedOn":"2026-11-08","note":"Stage 1 by John Holland CPB Contractors joint venture. Stage 2 contract of $4.24 billion to ACCIONA in December 2022."},{"url":"https://www.nsw.gov.au/ministerial-releases/second-giant-tunnel-boring-machine-begins-excavating-for-western-harbour-tunnel","title":"Second giant tunnel boring machine begins excavating for the Western Harbour Tunnel","publisher":"NSW Government","publishedOn":"2026-08-11","accessedOn":"2026-11-08","note":null},{"url":"https://www.acciona.com.au/projects/western-harbour-tunnel-stage-2","title":"Western Harbour Tunnel – Stage 2","publisher":"ACCIONA","publishedOn":null,"accessedOn":"2026-11-08","note":"Roadheaders, TBM sizes, segment count and the Emu Plains precast facility."}],"verificationStatus":"verified","lastVerifiedAt":"2026-11-08T00:00:00.000Z","modifiedAt":"2026-11-08T01:14:22.669Z"}