# Sydney Metro – Western Sydney Airport

> A 23-kilometre metro railway from St Marys to Bradfield City Centre through Western Sydney International Airport, with six stations.

Construction project in the Idalia directory of Australian construction. Web page: https://useidalia.com/construction-projects/sydney-metro-western-sydney-airport. JSON: https://useidalia.com/construction-projects/sydney-metro-western-sydney-airport.json.

## Facts

- Status: Under construction
- Type: Rail
- Location: St Marys to Bradfield, NSW
- Tunnelling contract awarded: December 2021
- Viaduct and civil contract awarded: March 2022
- Stations and systems contract awarded: December 2022
- Surface and civil works completed: Early 2025
- Official page: https://www.sydneymetro.info/westernsydneyairportline

The Sydney Metro – Western Sydney Airport line is a new 23-kilometre metro railway in Greater Western Sydney. It runs from St Marys, where it connects with the T1 Western Line, through Western Sydney International (Nancy-Bird Walton) Airport to Bradfield City Centre. The six stations are St Marys, Orchard Hills, Luddenham, Airport Business Park, Airport Terminal and Bradfield.

## Contracts

The Australian and NSW governments awarded three major contracts.

- **Station boxes and tunnelling.** In December 2021, a joint venture of CPB Contractors and Ghella won the $1.8 billion contract for 9.8 kilometres of twin tunnels in two sections: 4.3 kilometres from St Marys to Orchard Hills, and 5.5 kilometres from the Airport Business Park to the Aerotropolis. The contract also covers excavation of the underground station boxes.
- **Surface and civil alignment works.** In March 2022, a joint venture of CPB Contractors and United Infrastructure won the contract for about 3.5 kilometres of elevated viaduct at Orchard Hills and Luddenham, 6.7 kilometres of earthworks for the track, a 190-metre rail bridge over the M12 Motorway, and a rail bridge inside the airport. CPB Contractors reports that this work was complete in early 2025.
- **Stations, systems, trains, operations and maintenance.** In December 2022, the Parklife Metro consortium won this public private partnership. It covers the six stations, 12 trains, the rail systems, and the stabling and maintenance facility at Orchard Hills, and 15 years of operations.

## Status

The tunnels, viaducts and earthworks are complete. In November 2026, Parklife Metro crews were installing facade panels, blockwork, handrails and doors at the Airport Terminal and Airport Business Park stations, with work in the rail corridor on signalling, overhead wiring and rail grinding. Sydney Metro scheduled this station work to continue until at least February 2027.

## Companies on this project

- [Sydney Metro](https://useidalia.com/companies/sydney-metro.md): Client
- [CPB Contractors](https://useidalia.com/companies/cpb-contractors.md): Joint venture partner. Station boxes and tunnelling with Ghella, and surface and civil alignment works with United Infrastructure
- [Ghella](https://useidalia.com/companies/ghella.md): Joint venture partner. Station boxes and tunnelling, 9.8 km of twin tunnels, with CPB Contractors
- [United Infrastructure](https://useidalia.com/companies/united-infrastructure.md): Joint venture partner. Surface and civil alignment works: viaducts, earthworks and rail bridges, with CPB Contractors

## Related projects

- [Sydney Metro West](https://useidalia.com/construction-projects/sydney-metro-west.md): A 24-kilometre underground metro railway between Westmead and Hunter Street in the Sydney CBD, with nine stations and a target opening in 2032.
- [M12 Motorway](https://useidalia.com/construction-projects/m12-motorway.md): A 16-kilometre toll-free motorway between the M7 at Cecil Hills and The Northern Road at Luddenham, and the main road access to Western Sydney International Airport.
- [Warringah Freeway Upgrade](https://useidalia.com/construction-projects/warringah-freeway-upgrade.md): An upgrade of four kilometres of the Warringah Freeway between North Sydney and Naremburn, built in live traffic and due for completion in late 2026.
- [Western Harbour Tunnel](https://useidalia.com/construction-projects/western-harbour-tunnel.md): A 6.5-kilometre motorway tunnel under Sydney Harbour, with three lanes each way, between the Rozelle Interchange and the Warringah Freeway near North Sydney.
- [Botany Rail Duplication](https://useidalia.com/construction-projects/botany-rail-duplication.md): A second track on the last 2.9-kilometre single-track section of the freight rail line between Mascot and Port Botany, with four new rail bridges.
- [Coffs Harbour Bypass](https://useidalia.com/construction-projects/coffs-harbour-bypass.md): A 14-kilometre bypass of Coffs Harbour on the Pacific Highway, from Englands Road in the south to Sapphire in the north, with three road tunnels.

## Sources

- [Western Sydney Airport project overview](https://www.sydneymetro.info/westernsydneyairportline): Sydney Metro, accessed 2026-11-08.
- [Sydney Metro – Western Sydney Airport newsletter, January 2022](https://www.sydneymetro.info/sites/default/files/2022-01/WSA_Newsletter_January2022.pdf): Sydney Metro, published 2022-01-01, accessed 2026-11-08. $1.8 billion tunnelling contract to CPB Contractors and Ghella. Tunnel section lengths.
- [Sydney Metro – Western Sydney Airport, Surface and Civil Alignment Works](https://www.cpbcon.com.au/our-projects/2022/sydney-metro-western-sydney-airport-surface-and-civil-alignment-works): CPB Contractors, accessed 2026-11-08. Joint venture with United Infrastructure. Work completed in early 2025.
- [Notification: Airport Business Park and Airport Terminal metro stations, November 2026](https://www.sydneymetro.info/sites/default/files/2026-10/ABP_and_ATL_community_notification_November_2026.pdf): Sydney Metro, published 2026-10-01, accessed 2026-11-08.

## Record

- Last verified: 2026-11-08
- Last updated: 2026-11-08
