How to track plant and equipment on each job site

EREdward Renton

To track plant and equipment on each job site, record four things for each asset: where it is now, which project it is allocated to, the dates of that allocation, and its status. Keep these records in one register that the office, the yard, and the site all use. When gear moves, the person who moves it updates the register on the same day.

Most crane hire companies, plant hire companies, and contractors already have a list of their gear. The problem is not to start a register. The problem is to trust it on a busy Tuesday, when three jobs change at the same time.

What "on site" means

"Which gear is on site" sounds like one question. In practice, it is several:

  • A unique machine, such as an excavator or a mobile crane, is at one address at a time. You should be able to easily see where each of your unique machines are, what they're doing and what condition they're in, and where they're going next.

  • Items that you count by quantity, such as tower sections, counterweights, or mats, can be split across a yard and several sites. For these, you want to know how many you have at each yard and site.

  • An assembly, such as a tower crane, is made of components. The mast can be on site while some sections are still in the yard.

  • An attachment can move with its machine, or it can go to a different job.

A good register answers each of these questions. A list of machine names does not.

When a simple list is enough

A spreadsheet, a whiteboard, or one tab for each job is enough when:

  • One person owns the list and updates it.

  • The fleet is small enough to count by memory.

  • Jobs rarely overlap, and dates rarely change.

If this describes your business, keep the list. Software will not fix a process that already works.

Five signs that the register is wrong

1. Gear stays on finished jobs

The job finished two weeks ago. The register still shows the crane on site. The planner tells a customer that it is not available, and you lose the hire. Or the planner assumes that it came back, and books it on a job when it is still on the old site.

2. Two people give the same machine to two customers

The hire desk books a machine for one customer. A project manager allocates it to a job from a different copy of the list. Nobody sees the conflict until the second job calls for the machine.

3. The yard count does not match the register

The register says that there are 40 tower sections in the yard. A physical count finds 31. Some went to a site without a record. Some came back damaged and are in the workshop. Every plan that uses the number 40 is wrong.

4. The site works from an old list

The office emails the plan on Monday. On Wednesday, the plan changes. The site supervisor still uses the Monday list, and calls the yard for gear that went to a different job.

5. Transport does not agree with the register

A truck is booked to take gear to site on Tuesday. The register shows that the gear went last week. Or the load list does not include the counterweights, because the person who booked the truck used a different sheet. The truck arrives without the right parts.

What good asset tracking looks like

  • There is one register. The office, the yard, and the site all use it.

  • Each asset has an exact location: a named yard or a named job site. "TBC" is not a location.

  • Each allocation has a project, a start date, and an end date.

  • Each asset has a status, so you can tell gear that is available from gear that is on hire or in the workshop.

  • Items that you count by quantity show the quantity at each location.

  • The site can see what is allocated to the job without a phone call to the office.

  • Each change is recorded: who moved the asset, when, and to where.

Know what you will need, not only where it is today

A correct register tells you where your gear is today. It does not tell you if you will have enough next month.

When a project moves by two weeks, the gear stays on that site for two more weeks. Another job that expected that gear will be short. To see this before it happens, compare the allocations with the project dates, and calculate the quantity at each yard for each future week.

This is difficult in a spreadsheet, because each change to a project date must be copied to every affected row. Software that links allocations to the project schedule can calculate it automatically.

How Idalia tracks plant and equipment

In Idalia, each asset has a location, a status, and a history:

  • Allocation orders reserve gear, or a quantity of gear, on a project for a set of dates.

  • Each transport load lists the assets on the truck, and moves them from one location to another.

  • The history shows each change to status, location, and project.

  • A forecast shows the quantity on hand at each yard and site over the next six weeks or six months. It uses the project schedule and the allocations.

  • Site teams, drivers, and operators see allocations and transport history on the mobile app.

How to make a register correct again

  1. Use one name for each asset type, and use the same name everywhere.

  2. Close the jobs that are finished. Move their gear back to a yard in the register, or find out where it actually is.

  3. Count the gear at each yard and each site once. Correct the register to agree with the count.

  4. Decide which items you track as unique items, which you count by quantity, and which you track as assemblies.

  5. Tell everyone who moves gear that they must update the register on the same day.

  6. Pick a date to stop the use of the old lists. If two lists stay open, nobody knows which one is correct.

In Idalia, you can import the corrected register from a spreadsheet with bulk upload.

Summary

To know which plant and equipment is on each job site, keep one register with the location, allocation, dates, and status of each asset, and update it when gear moves. When gear stays on finished jobs, counts do not agree, or transport and the register disagree, the register is no longer correct. Correct it with a physical count, then link it to your project dates so that you can see shortfalls before they happen.